Fixing the water system at the Well House
The most important task of the current team from Fellowship Bible church is to get our long dormant water system operating now that we have access to city water. They are installing a new ground level 3000 l tank to accumulate the water when it comes - generally once a week - sometimes every two weeks. Then it will be pumped to a 2000 l tank 50 ft in the air, which will provide gravity feed to the three buildings. In addition to getting the tank in place, the team had to run all new piping. The picture is of the team raising the tank to the stanchion.